Architecture Considerations
Main Hotel Building
Main Hotel Building The main hotel building, situated on the roof of Iran Mall, is under construction with 18 floors and a height of 105 meters from the adjacent passageway level. It is a luxurious and multi-purpose structure with 359 accommodation suites, offering an experience of splendor and comfort through diversity in size and quality of accommodation spaces. The central lobby, with a height of 26 meters and a span of 42 meters, is one of the most luxurious lobbies in the region's 5-star hotels. Specialized restaurants, including French, Italian, Chop House, Iranian, and Oriental, serve foods compatible with various tastes. Luxurious presidential suites with an area close to 1,000 square meters have been designed for high-ranking guests with security and accommodation standards. Floors 13 and 14 host two pools and saunas with a built area of 1,800 square meters per floor, which, with natural lighting, enhance the sense of relaxation. The hotel landscape, with an area of 22,000 square meters, including smart water features and diverse green spaces, is connected to the Iran Mall roof and health path.
Amphitheater and Banquet Hall
The Iran Mall amphitheater, with an area of 8,300 square meters and a capacity of 1,900 people, is the country's most advanced acoustic hall, enabling events without sound amplification. This hall includes a concert hall, sound, lighting, simultaneous translation rooms, VIP space, artist spaces (makeup, rehearsal) and stage support (equipment storage, piano). The integrated geometric design provides an unparalleled experience for cultural events and has the capability to serve independently from the hotel building.
Opposite the amphitheater hall, the banquet hall with a capacity of 1,000 people for two simultaneous events, has a structural truss with a 50-meter span and a 50-meter diameter cylinder. The 27-ton chandelier in this hall is the largest chandelier in Iran. 11 supporting meeting halls with flexible design provide the possibility of holding any type of gathering.
Spa Building
The spa building, with an approximate area of 9,500 square meters, is the country's most modern spa complex with 107 various spaces, capable of providing 21 simultaneous services to men and women. This building includes an Iranian traditional bath with pre-Qajar motifs, covered and open swimming pools, children's pool, gym, billiards room, therapeutic massage, salt therapy, steam, dry and snow saunas, restaurant, and service and administrative spaces.
Art Gallery
The Iran Mall art gallery, with an area of 9,000 square meters, designed with the consultation of renowned French consultants, is unique in the country and includes the first standard auction space approved by the Pushkin and Louvre museums. This gallery has an exhibition hall, auction, children's gallery, art classes and workshops, bookstore, art works store, VIP lounge, loading dock, special warehouses for art objects, skylight, and cafeteria, providing a dynamic environment for cultural interactions.
Engineering Considerations
کلیه نقشههای مهندسی و استراتژیهای اجرایی بر اساس نظر شرکت ACCOR/FAIRMONT ، بهرهبردار پروژه، تهیه و تدوین شدهاند.
Structure
The hotel tower structure, given the project's special architecture, has been accompanied by significant complexity in both design and execution. The considered structural system for the main hotel building is a special bending frame type along with special reinforced concrete shear walls. The executed structure dimensions are approximately 200 meters in length, 109 meters in height, and 30 meters in width. To provide suitable space for the project hotel lobby, a space called mega truss including 4 trusses with a height of 10 meters and a length of 30 meters, connected in three dimensions by a set of elements, has been used. The approximate weight of this structure is about 2,000 tons from ST-52 sheet and 50,000 high-strength bolts (10.9) have been used in this structure. The construction and installation time of this structure was 4 months.
The loads of floors 7 to 16 in the middle wing are borne and transferred to the foundation through four walls and concrete core by this structure. Due to the presence of pools on floors 13 and 14 for ladies and gentlemen, to provide suitable space for the pool bowl execution, two plate girders with a length of 30 meters in each floor weighing 20 tons have been used. Due to the long length of the beams, two towers have been used simultaneously for the installation of the structure.
The room dividing walls, to establish maximum comfort and safety, in accordance with the latest acoustic standards and fire protection, have been executed as double-walled from AAC blocks with thermal insulation and smoke-sealed coverings. The terraces in the eastern and western sides overlooking the Iran Mall roof and the Persian Gulf lake have been designed with full glass facade (Curtain Wall) and automatic curtains. In the banquet hall plan, which has a general cylindrical shape with a diameter of 50 meters, a truss structure with a length of 50 meters has been considered, and a 27-ton unique chandelier will be installed on its ceiling.
The input paths to the amphitheater hall in the northern and southern sections of the main hall pass through a full-glass atrium with unique walls. These walls are made of three-layered glass including one 10 mm glass layer and two 8 mm glass layers, product of Saint-Gobain France with heat transfer coefficient U=1.0 and shading coefficient Shading Coeff.=0.23.
The atrium wall facade design of the amphitheater is of Cable-net type, in which the loads of the facade are entirely borne by cables and transferred to the main structure through clamps. In this type of facade, no elements are visible behind the glass. The connections of this structure are all hinged, and to maintain its stability, in part of the facade, truss-shaped elements in the shape of the facade have been designed. This facade has been designed and executed for the first time in the Iran Mall project. The structure columns are of tubular section with a diameter of 600 mm with hinged connections. The used cables are from Fatzer Switzerland and the clamps are product of King Long China.
Mechanical systems
In the air conditioning system plan of this collection, feeding the air handlers and fan coils has been done with four-pipe cold and hot water piping along with variable speed pumps and control valves (picv). In all independent small spaces and guest rooms, two-coil fan coils and for the amphitheater hall, pools, and restaurants, as well as to supply fresh air to accommodation and administrative spaces, air handlers equipped with inverters with high filtration capability and sound control have been utilized. The use of the mentioned systems in air conditioning, in addition to precisely meeting the needs of each space, has significant effects on reducing energy consumption and equipment depreciation.
تولید آب سرد در مجموعه توسط چیلرهای جذبی و نیز چیلرهای تراکمی هواخنک صورت می گیرد تا هم از مزیت هزینه های کمتر سوخت گاز حین بهره برداری استفاده شود و هم در فصول بینابینی بتوان از چیلرهای تراکمی جهت ایجاد سرمایش فضاها استفاده نمود. برای ایجاد گرمایش ساختمان و استخرها و نیز تامین بخار چیلرهای جذبی در تابستان از بویلرهای بخار استفاده شده است. تعدد سردخانه های مورد نیاز جهت نگهداری مواد غذایی آشپزخانه های مختلف هتل موجب شد تا چیلرهای ضدیخ (براین) سرمایش مناسب جهت سردخانه های بالای صفر را فراهم کنند.
سیستم های اطفای حریق اتوماتیک در داخل کلیه فضاها و نیز در بالای سقف های کاذب در کنار جعبه های آتشنشانی آسودگی خاطر حداکثری را در صورت وقع حریق سبب می شوند. مشاورین مجرب تخصصی در حوزه حریق، سیستم های تخلیه دود را علاوه بر طبقات پارکینگ در کلیه ویدها (آتریوم ها)، آمفی تئاتر، گالری هنر و ساختمان اسپا به منظور افزایش مضاعف ایمنی مراجعین و ساختمان ها در برابر حریق طراحی نموده اند. علاوه بر اینها، در استراتژی حریق عملکرد کلیه آسانسورها، درب های اتوماتیک، پرده های دود، فن ها و دمپرها و نیز چگونگی واکنش فن کویل ها و هوارسان ها با سناریوهای پیش بینی شده حریق مطابق استاندارد هماهنگ شده اند. در بخش هایی از گالری هنر مانند سالن حراج که آثاری با ارزش قابل توجه عرضه می شوند بجای استفاده از سیستم های معمول، از سیستم اطفای حریق واترمیست استفاده شده است.
در کلیه سرویس های بهداشتی بکارگیری شیرآلات توکار با کنترل ترموستاتیک به جهت ارتقای کیفیت بصری در کنار افزایش حس راحتی مراجعین در دستور کار قرار گرفت. همچنین در راستای کاهش قابل توجه مصارف آب در پروژه، کلیه خطوط فاضلاب سبک و سنگین در مجموعه به صورت جدا جمع آوری گردیده اند و از آب حاصل از تصفیه فاضلاب خاکستری به منظور تغذیه فلاش تانک ها و برج های خنک کن استفاده شده است. تصفیه آب در اغلب استخرها به صورت سرریز با شبکه لوله کشی UPVC و بکارگیری فیلترهای شنی و دیاتومیت طراحی گردید تا در نهایت با ضدعفونی آب با سیستم الکترولیز آب نمک، آب استخرها کاملا زلال و شفاف به نظر برسد.
تأسیسات الکتریکی و کنترلی
سیستم مدیریت هوشمند اتاق(GRMS) با کلیدهای تمام لمسی وظیفه کنترل کلیه سیستم های الکتریکی و مکانیکی اتاق مهمان اعم از کنترل روشنایی ها، کنترل پرده اتاق و کنترل سیستم صوتی را برعهده دارد. همچنین به دلیل ارج نهادن به مقوله کاهش مصرف انرژی، تراس های این مجموعه به سیستم Energy Saving مجهز می باشد، به طوری که بر اساس سناریوی از پیش تعیین شده، در صورت باز مانده درب تراس فن کویل را از طریق سیستم GRMS غیر فعال می نماید. همچنین به دلیل وجود سنسور حضور (Occupancy Sensor) حتی در زمانی که مهمان در اتاق در حال استراحت می باشد این امکان فراهم است تا طبق سناریوهای از پیش تعیین شده، سیستم های کنترلی به وظایف خود در جهت رفاه مهمان عمل نماید. در همین راستا به منظور افزایش رفاه مهمانان، برای یخچال ها سیستمی در نظر گرفته شده تا در هنگام استراحت میهمان موتور یخچال خاموش شده و از طریق کپسول منجمد شده به همراه یک فن کم نویز محتویات یخچال خنک نگهداشته شود تا نویز محیط به حداقل میزان استاندارد برسد.
جهت برقراری شرایط ایمن برای مهمان، علاوه بر سیم و کابل های مقاوم در برابر حریق و LSHF، سیستمهای کشف و اعلام حریق با سناریوهای مختلف در کلیه فضاها بکارگیری شده است. سیستمهای تخلیه صوتی و پیغام عمومی (EVCS & PA) رویدادهای چندمنظوره را پشتیبانی میکنند. فضاهای مشاعات و تاسیساتی مجموعه متصل به سیستم BMS بوده و نیرو رسانی به کلیه فضاهای برج هتل به وسیله Bus Duct تامین می گردد. چراغ های استفاده شده در این مجموعه از چراغ های دان لایت هتلی منطبق با بالاترین استانداردها در جهت حذف حداکثری خیرگی و چشم زدگی استفاده شده است. در هر سوئیت دیوار جدا کننده فضای نشیمن از حمام با استفاده از تکنولوژی کریستال مایع (PDLC) قابلیت شفاف و مات شدن را توسط سیستم کنترلیGRMS داراست. سیستم تلویزیون استفاده شده در این پروژه نیز از نوع HOSPITALITY می باشد که در سناریوی هوشمند سازی مشارکت دارد.
- تأسیسات مکانیکی هوشمند و کممصرف: سیستم تهویه چهارلولهای، چیلرهای جذبی و تراکمی، کنترل دقیق انرژی و تأمین هوای تازه با حداقل صدا. ایمنی حریق در بالاترین سطح استاندارد
- ایمنی حریق در بالاترین سطح استاندارد: سیستمهای اطفای اتوماتیک، تخلیه دود پیشرفته، سناریوهای عملکردی هوشمند و استفاده از واترمیست در فضاهای حساس گالری هنر.
- رویکرد پایدار در مصرف آب: جداسازی فاضلاب خاکستری و استفاده مجدد برای فلاشتانکها و برجهای خنککن، تصفیه پیشرفته آب استخرها.
- طراحی سازهای پیچیده و نوآورانه: استفاده از سیستم قاب خمشی ویژه و دیوار برشی بتنآرمه، مگاتراس فولادی 2,000 تنی و اجرای دهانههای بزرگ بدون ستون میانی.
- نمای شیشهای پیشرفته و خاص: نمای Curtain Wall و Cable-Net با شیشههای سهجداره Saint-Gobain و حذف المانهای مرئی سازهای در جداره آتریوم.
- ارتباط یکپارچه با بام ایران مال: محوطهسازی 22,000 مترمربعی شامل آبنماهای هوشمند، فضای سبز و اتصال مستقیم به مسیر سلامت.